|
Constructing mud & brick walls for the patient urinals, to replace the flimsy bamboo walls. |
All walls nearly completed. |
Painting the outside of the newly constructed compartment which serves as protection for the pump. |
Painting the permanent stairs to the roof, replacing a shaky bamboo ladder. |
Re-cementing the kitchen veranda, to prevent water flowing inside the kitchen during heavy rains. |
The plastering above some windows also needs correcting. |
Preparing the ground for the new location of the nutritional herbs garden. |
Making the boundaries of the individual plots at the new location. |
|
Painting new fences which provide additional protection to the herbal garden. |
|
The herbs are growing better now that we have a pump to provide more water for irrigation. |
|
With the beginning rainy season, new vegetable garden plots are prepared for planting. |
Setting up the tents for our new improved filming of the nutritional education drama. |
This time the filming is done scene by scene in a more controlled "studio environment". |
To minimize disturbing noise the villagers are not invited, but they nevertheless gather to enjoy the play. |
Our weekly screenings of the drama in the surrounding villages continue to attract large audiences. |
An additional screening at our clinic every Sunday, when most patients are present. |
|
TOP • BACK TO GALLERY PAGE • BACK TO HOME PAGE
|